1/5/10/30/50Pcs FSR402 Resistive Thin Film Pressure Sensor Long Lead Wire Force Sensitive Resistor Pressure Detect Switch

1/5/10/30/50Pcs FSR402 Resistive Thin Film Pressure Sensor Long Lead Wire Force Sensitive Resistor Pressure Detect Switch

10Pcs
$124.65
Sale price  $124.65 Regular price  $0.00
Skip to product information
1/5/10/30/50Pcs FSR402 Resistive Thin Film Pressure Sensor Long Lead Wire Force Sensitive Resistor Pressure Detect Switch
1/5/10/30/50Pcs FSR402 Resistive Thin Film Pressure Sensor Long Lead Wire Force Sensitive Resistor Pressure Detect Switch
$124.65
Sale price  $124.65 Regular price  $0.00
Color
Description

SPECIFICATIONS

Brand Name: NONE

Choice: yes

High-concerned chemical: none

Origin: Mainland China

GND: negative supply voltage

DO: High point level signal output

AO: analog voltage signal output (0-3.3V)

AO-RES: magnification adjustment potentiometer

DO-RES: comparison threshold adjustment potentiometer

Instructions for use:

Gasket installation

Place the green surface of the gasket on the sensor, in the center of the sensor sensing area, and then apply the tested object vertically to the gasket, so that the effective contact and force of the sensor and the tested object all act on the sensor sensing area.

Precautions when installing and using the sensor

1. Try to choose a stable, smooth and flat installation surface;

When your mounting surface is curved, you must bend it when you install the sensor, so that-the sensor sensing area will be stressed, which will affect the accuracy of the sensor to a certain extent, so be careful not to make the sensor effective The surface is installed on a curved surface with a large curvature (Note: the round effective surface cannot be bent, and the long tail can be bent);

2. It is recommended to use a flexible gasket with a relatively stable elasticity between the sensor and the measured object to ensure effective contact between the sensor and the measured object;

3. Keep the contact surface of the sensing area clean;

4. The force should not exceed its rated range;

5. Try not to solder it directly to the universal board or the circuit board without the specific package belonging to it, so as to avoid the thermal deformation of the tail and poor contact. The metal terminal of the sensor can be connected to the wire by fast welding.


Free Shipping Over $199
  • Standard Shipping: Standard Shipping (12–18 Business Days)
  • Express Shipping: Expedited Shipping (5–9 Business Days)
  • Free Shipping: Orders over $199 qualify automatically
  • Tracking: Full tracking number provided for all orders
30-Day Return Policy
  • Returns: 30-day hassle-free return window
  • Condition: Items must be unused and in original packaging
  • Refund: Full refund processed within 3-5 business days
Why Choose Us?
  • Factory Direct: ISO/TS 16949 certified manufacturer
  • Quality: 100% electrical continuity tested before shipment
  • Experience: 15+ years in automotive connector industry
  • Support: Professional technical support available
Secure Payment Latest encryption technology
Money-Back Guarantee 30-day hassle-free returns
Quality Assured Factory certified products
Global Fast Shipping Worldwide express delivery

You may also like

Contact us

Subscribe to our emails

Be the first to know about new collections and special offers.