Skip to product information
NEW Quectel SC20 module SC20-EVM smart board for android system 4G LTE android development boards with lte
$821.84
Sale price
$821.84
Regular price
$0.00
Description
SPECIFICATIONS
Brand Name: NONE,Getcom.AI
CPU: CPU SC20 1.1GHz quad-core A7 processor
Core Processor: Quad core ARM Cortex-A7 1.1GHz
DDR: 1GB LPDDR3
Description: Development Board
Environmental Require: -40°C ~ +75°C
Model Number: SC20-EVM
Module: Quectel SC20
Operating System: Android, Linux
Origin: Mainland China
Place of Origin: China
Power input Support: Support 12V wide voltage DC power input
Storage: 8GB eMMC
System: Android 7.1
Type: Development Board
Welcome to our official store!
We provide reliable quality, secure packaging and on-time delivery.
If you have any questions or inquiries, please feel free to message us.
We are always at your service.
Due to the time difference, my reply may be delayed.
Please leave a message, and I will get back to you as soon as possible.
WhatsApp: +86 173 5287 0921Welcome to our official store!
We provide reliable quality, secure packaging and on-time delivery.
If you have any questions or inquiries, please feel free to message us.
We are always at your service.
Due to the time difference, my reply may be delayed.
Please leave a message, and I will get back to you as soon as possible.
WhatsApp: +86 173 5287 0921Hello, my friend, if I can't reply to you in time, please contact me on WhatsApp: +8618124781192or my email number :2693290064@qq.com. Thank you for coming to my shop.
Product Description
SC20 is a series of multi network smart LTE cat 4 modules launched by mobile communication, Equipped with Android operating system. SC20 series modules include a total of seven versions:SC20-CE,SC20-E,SC20-A,SC20-AU,SC20-J,SC20-EUand SC20-W(just support Wi-Fi & BT).SC20 support LTE FDD Max 150Mbps downlink and 50Mbps Uplink data transmission,backward compatible EDGE and GSM/GPRS network,to ensure that it works well in areas lacking 3G and 4G networks; Also supports IEEE 802.11 a/b/g/n (SC20-CE/-W Default support IEEE 802.11 b/g/n) wireless transmission protocol and BT4.1 LE Bluetooth technology(Android 7.1 and above version support BT4.2). SC20 supports multiple-input multiple-output (MIMO) technology. Multiple receiving antennas can be used at the receiving end, so that the signal can be received through multiple antennas at the receiving end, thereby increasing the downlink rate, reducing the bit error rate and improving the communication quality. At the same time, SC20 supports GPS+GLONASS+BeiDou multiple positioning systems, which greatly improves the positioning speed and accuracy. SC20 integrates function-rich interfaces (such as LCM, camera, touch screen, microphone, speaker, UART, USB, I2C interface, etc.), which greatly expand the application of SC20 in the M2M field, and can be widely used in MID, PND, POS, routers , data cards, in-vehicle terminals, smart phones, digital billboards, security, and industrial-grade PDAs and other industries and equipment. The main advantages of SC20: equipped with Android operating system, integrated Wi-Fi, Bluetooth and GNSS; comprehensive coverage of various network standards; support for MIMO.Technology improves the data transmission rate and connection reliability of wireless communication; integrates multi-constellation GNSS receivers to meet the needs of fast and accurate positioning in different environments; adopts LCC+LGA package, which is convenient for patching and testing.
Shipping List
Specification
|
Features
|
Instructions
|
|
CPU
|
Quad core ARM Cortex-A7 1.1GHz
|
|
DDR
|
1GB LPDDR3
|
|
Storage
|
8GB eMMC
|
|
SC20-CE Band
|
LTE FDD: B1/B3/B5/B8
LTE TDD: B38/B39/B40/B41
TD-SCDMA: B34/B39
EVDO/CDMA: BC0
WCDMA: B1/B8 GSM: 900/1800MHz
|
|
SC20-E Band
|
LTE FDD: B1/B3/B5/B7/B8/B20
LTE TDD: B38/B40/B41
WCDMA: B1/B5/B8
GSM: 850/900/1800/1900MHz
|
|
SC20-A Band
|
LTE FDD: B2/B4/B5/B7/B12/B13/B25/B26
WCDMA: B1/B2/B4/B5/B8
GSM: 850/1900MHz
|
|
SC20-AU Band
|
LTE FDD: B1/B3/B5/B7/B8/B28
LTE TDD: B40
WCDMA: B1/B2/B5/B8
GSM: 850/900/1800/1900MHz
|
|
SC20-J Band
|
LTE FDD: B1/B3/B8/B18/B19/B26
LTE TDD: B41
WCDMA: B1/B6/B8/B19
|
|
LVDS
|
30-pin industry standard dual LVDS interface, support VESA/JEITA format, up to 1366*768 output
|
|
HDMI storage
|
HDMI 2.0a standard display interface, up to 720P output
|
|
Amplifier output
|
8 ohm 6W dual audio amplifier output
|
|
MIC input
|
Differential MIC input (pin header)
|
|
USB interface
|
2 horizontal ports (and USB 2.0x1)
|
|
Serial port
|
1 TTL/232 built-in, 1 TTL/232/485 compatible built-in, 4 extended TTL/RS-232 compatible built-in
|
|
TF card
|
Self-elastic TF card socket, supports up to 128GB TF card
|
|
WiFi
|
Built-in high-performance SDIO interface WiFi module, support IEEE 802.11 b/g/n/ac, support dual-mode WiFi (2.4/5GHz)
|
|
Bluetooth
|
Built-in high-performance serial port BT module (optional), support V2.1+EDR/BT v3.0/BT v3.0 +HS/BT v4.0
|
|
Ethernet port
|
10/100M Adaptive Ethernet RJ45 port
|
|
Backlight control
|
Industry standard LCD backlight control interface, support backlight switch and brightness adjustment
|
|
GPIO interface
|
Expandable GPIO buttons and/or 3.3V output
|
|
I2C Bus
|
I2C pin header interface, expandable I2C capacitive screen, etc.
|
|
Button Burn button
|
Burn button(RECOVERY)
|
Free Shipping Over $199
- Standard Shipping: Standard Shipping (12–18 Business Days)
- Express Shipping: Expedited Shipping (5–9 Business Days)
- Free Shipping: Orders over $199 qualify automatically
- Tracking: Full tracking number provided for all orders
30-Day Return Policy
- Returns: 30-day hassle-free return window
- Condition: Items must be unused and in original packaging
- Refund: Full refund processed within 3-5 business days
Why Choose Us?
- Factory Direct: ISO/TS 16949 certified manufacturer
- Quality: 100% electrical continuity tested before shipment
- Experience: 15+ years in automotive connector industry
- Support: Professional technical support available
You may also like
Blog posts
Title
An excerpt of your blog post's content
Title
Date|Author
Subscribe to our emails
Be the first to know about new collections and special offers.